Ignition case studies from 110+ industrial sites

Plantformance is a Swiss Inductive Automation Alliance Partner that builds and runs Ignition systems for manufacturers. These 37 case studies cover Plantformance FactoryBrain managed Ignition on-premises, FactoryTouch and FactoryClient operator terminals, Ignition modules, MES, data integration and security work in real plants. Plantformance manages 110+ sites in 34+ countries and has deployed 800+ Ignition modules.

  • 37projects
  • 110+sites managed
  • 34+countries
  • 800+modules deployed

Download all case studies (PDF)

Ignition projects by solution and industry

37 case studies

An abrasives manufacturerMES and traceability

Full MES cuts customer complaint response time by 99%

An abrasives manufacturer making expensive, long-lead parts went from paper tracking to a full MES. Complaint answers now take minutes, productivity rose 20%, and customer complaints fell 30%.

  • 99% less time to answer a customer complaint
  • +20% productivity
  • 30% fewer customer complaints
Read the case study

A multi-site manufacturing groupIntegration and data

New interfaces reach 20 factories in 2 weeks instead of years

A manufacturing group running Ignition under strict security rules needed approval for every new connection at every plant. Plantformance built one reusable data layer, so a new interface now goes from request to 20 factories in 2 weeks.

  • 2 weeks from interface request to rollout
  • 20 factories per rollout
Read the case study

A multi-site abrasives manufacturerIntegration and data

Streaming factory data to Azure in one click across 31 factories

An abrasives manufacturer wanted local data from 31 factories in its Azure cloud without new security approvals per site. Plantformance built one central connection and an Ignition module that lets developers stream any tag with a click.

  • 31 factories in scope
  • 5 s default send interval
  • 10k tags per aggregated batch
Read the case study

A multi-site manufacturing groupIntegration and data

Edge MySQL tables replicated to Azure with no maintenance

A manufacturing group needed exact cloud copies of its local Ignition tables without touching edge performance. Plantformance built a change-capture pipeline, so turning on sync for a table now takes a 2-minute change request.

  • 15 min change-check interval
  • 1:50 typical compression ratio
  • 2 min to build a sync change request
Read the case study

A European glass producerManaged Ignition

Ignition live in a large factory 5 days after the order

A glass producer wanted Ignition in a large factory running traditional SCADA. Plantformance shipped stock FactoryBrain servers within 24 hours, and Ignition was live for developers 5 days after the order.

  • 5 days from order to Ignition live on site
  • -97% versus usual project duration
  • 24 h to ship the servers
Read the case study

A multi-site manufacturing groupSecurity and infrastructure

Real-time SIEM security feed on 180+ servers, with no added cost

A manufacturing group asked Plantformance to install a centrally managed endpoint security agent on its Ignition servers. Plantformance proposed hardened Linux controls plus real-time event forwarding instead, rolled out to 180+ servers at no extra cost.

  • 180+ servers rolled out the next day
Read the case study

A multi-site industrial manufacturerManaged Ignition

Isolated development servers with no change in operating costs

A manufacturer wanted to separate Ignition development from production across 90 factories. Plantformance turned the spare FactoryBrain node into an isolated development instance, so any site with a 2-server setup can add one with no change in operating costs.

  • 90 factories previously shared 1 or 2 development servers
Read the case study

An abrasives manufacturerHMI

Operator clients live the same day as servers, with TCO down 80%

Ignition projects were stalling because operator PCs arrived months after the servers. Plantformance built FactoryClient, a purpose-built Ignition client with a 2 min setup assistant, cutting total cost of ownership by 80%.

  • -80% total cost of ownership
  • 3-6 months previous wait for operator clients
  • 2 min configuration assistant at boot
Read the case study

PlantformanceManaged Ignition

Managing 200+ Ignition servers in one click, 99% faster

Configuring a fleet of 200+ Ignition servers one by one took too long and risked drift. Plantformance built an Ignition module that lets its orchestrator run changes on server groups in one click, cutting execution time by 99%.

  • 99% less configuration execution time
  • 1 min to configure 10 servers, down from 10 min each
  • 200+ Ignition servers managed
Read the case study

A glass manufacturerMES and traceability

Machine monitoring that has run 7 to 8+ years with zero changes

Plantformance replaced an aging machine monitoring tool on a critical glass line with an Ignition application that captures data at the right process moment, keeps full traceability and has run for years without modification.

  • 7 to 8+ years in production without changes
  • Zero application modifications required
Read the case study

An abrasives manufacturerMES and traceability

From hardcoded MES to a data-driven engine covering 14 machine types

An abrasives manufacturer rebuilt a sprawling, hardcoded MES into one data-driven engine for 14 machine types, so adding a machine or a site became a configuration task instead of a software project.

  • 96% test scenarios resolved (320 of 333) in the first month
  • 8 to 40 rollout-ready machines (of 75) in two weeks
  • 14 machine types on one engine
Read the case study

Saint-GobainManaged Ignition

3,000+ Ignition projects hosted for 8 years with zero data loss

For Saint-Gobain, Plantformance standardized FactoryBrain edge servers and centralized hosting with continuous telemetry, multi-tier backups and KPI tracking. The result: 3,000+ Ignition projects and multiple petabytes of data hosted over 8 years with zero data loss.

  • 3,000+ Ignition projects hosted
  • 8 yrs consecutive years of hosting
  • Zero data loss
Read the case study

Ignition case studies: frequently asked questions

What results do companies get from managed Ignition on-premises?

In these case studies, Plantformance FactoryBrain managed Ignition on-premises kept 18 factories running locally while a cloud ERP synced in the background, for a multi-site manufacturer. For Saint-Gobain, Plantformance has hosted 3,000+ Ignition projects for 8 years with zero data loss. A European glass producer had Ignition live 5 days after the order, against about 6 months for a typical project.

How long does a multi-site Ignition rollout take?

It depends on scope. A multi-site manufacturer rolled out Ignition on Plantformance FactoryBrain servers to 18 factories in 14 months. A multi-site manufacturing group upgraded 100+ factories to Ignition 8.3, at about 12 minutes per factory by the end of the program and a 96% success rate. For another multi-site manufacturing group, a reusable data layer takes a new interface to 20 factories in 2 weeks.

Can Ignition keep running when the cloud ERP is down?

Yes. For a multi-site manufacturer moving to a cloud ERP, Plantformance built a dedicated container on each FactoryBrain server that runs the ERP plumbing close to the line. Operators work 100% locally, while synchronization with the cloud ERP and updates run in the background. Plants keep operating through cloud or network incidents, and the factory cannot tell whether the cloud ERP is connected.

How does Plantformance secure Ignition servers?

Plantformance builds every customer-facing deployment on zero-trust networking, CISA Linux hardening, isolated containers and multi-layer intrusion detection. Multiple independent penetration tests found zero critical issues. For a multi-site manufacturing group, it added fapolicyd on top of SELinux and real-time forwarding of security events to the client SIEM on 180+ servers, at no extra cost. Saint-Gobain gets daily vulnerability scanning and monthly patching.

What Ignition modules does Plantformance build?

Plantformance offers 5 commercial Ignition modules: Gateway Analyzer, Security Auditor, Devices Mirroring, Ultra Charts and Host Agent, with 6 more in the pipeline. It has developed 16 Ignition modules internally, and modules replaced scripts on the gateways it manages. Security Auditor detects privilege escalation on the fly and responds automatically by disabling the account, deleting it or removing administrator rights.

Does Plantformance have Ignition MES references?

Yes. For an abrasives manufacturer, a full MES cut the time to answer a customer complaint by 99%, with 20% higher productivity and 30% fewer complaints. Saint-Gobain Glass moved from a custom version per plant to one laminated glass MES template. Saint-Gobain Abrasives runs a paperless, SAP-driven mixing workshop where WIP container lookups dropped from hours to seconds.

How fast does Plantformance respond to critical plant incidents?

Plantformance runs a 24/7/365 emergency workflow. FactoryBrain critical alarms and client P1/P2 tickets escalate to the on-call engineer by SMS and phone, under a 15-minute acknowledgment SLA that covers nights, weekends and holidays. When a server node failed at a Saint-Gobain Life Sciences site during a global hardware shortage, a pre-stocked FactoryBrain node shipped in 18 hours and was installed within 3 days.

Talk to a Plantformance Ignition engineer

Tell us about your plants and your Ignition setup. We will show you how similar projects were run.