Two factories carved out to a new owner with an 8-hour transition
Migration and carve-out

Two factories carved out to a new owner with an 8-hour transition

Client
NexinLife
Industry
Life-Sciences
2

factories carved out

When two NexinLife factories were sold to a new group, Plantformance ran the carve-out end to end. It lent a third server to each factory, rehearsed the cutover in advance, and cut connectivity to a single outbound IP and a single port. Both factories kept the same cloud ERP, with only an 8-hour transition period.

Key results

  • 2 factories carved out
  • 8 h transition period, no other impact on operations

The problem

Two factories were sold to a new group, but they had to keep operating with the same cloud ERP solution connected. The move was extremely complex. The previous owner required a highly secured, multi-stage connectivity setup, and the factories had to leave it for an environment that was still unknown. Any mistake would hit production directly. The factories needed a way to change owners, networks and connection paths without disrupting the shop floor.

What it looked like before

The Ignition instance connected to Plantformance through triple NAT, VPN and multiple ports, and to the ERP provider through two different solutions.

How Plantformance solved it

Plantformance lent a third server to each factory so the carve-out could be prepared with no impact on factory operations. We managed the entire project end to end. We proposed replacing the client's very complex connectivity with the Plantformance standard for servicing devices: a single outbound IP and a single port connection. Before the real cutover, we ran a full rehearsal of the carve-out operations, so the team knew every step and its timing in advance.

What changed

The FactoryBrain servers now connect directly to Plantformance infrastructure through a simple, modern connection. They connect to the ERP provider through the provider's standard.

Results

  • Both factories were carved out with no impact on operations beyond an 8-hour transition period
  • Connectivity simplified to a single outbound IP and a single port
  • ERP connection moved to the provider's standard method
  • Cutover rehearsed in advance on separate servers

Plantformance products and services used

FactoryBrain, Professional Services

Frequently asked questions

How did Plantformance avoid disrupting production during the carve-out?

Plantformance lent a third server to each factory so the carve-out could be prepared with no impact on factory operations. Before the real cutover, the team ran a full rehearsal of the carve-out operations, so every step and its timing were known in advance. The only impact was an 8-hour transition period.

How did factory connectivity change after the carve-out?

Before, the Ignition instance connected through triple NAT, VPN and multiple ports, and to the ERP provider through two different solutions. Plantformance replaced that with its standard for servicing devices: a single outbound IP and a single port. The FactoryBrain servers now reach the ERP provider through the provider's standard.

Related Ignition case studies

Planning a similar project? Talk to a Plantformance Ignition engineer or browse all 37 Ignition case studies.

Planning a similar Ignition project?

Tell us about your plants and your Ignition setup. A Plantformance engineer will show you how a project like this would work for you.