Failed server replaced in 3 days during a global hardware shortage
Managed Ignition

Failed server replaced in 3 days during a global hardware shortage

Client
Saint-Gobain Life Sciences
Industry
Cross-industry
3 days

failure ticket to on-site installation

When an out-of-warranty server node failed at a Saint-Gobain Life Sciences site during a global hardware shortage, Plantformance shipped a pre-stocked, provisioned and tested FactoryBrain node in 18h and completed the full replacement in 3 days, avoiding standard market lead times of 1 to 6 months.

Key results

  • 3 days failure ticket to on-site installation
  • 18 h incident to shipment

The problem

An out-of-warranty industrial server node failed at a Saint-Gobain Life Sciences site. The timing was bad. A severe global shortage of NVMe/SSD drives and enterprise server hardware was underway, and standard OEM replacement lead times usually ran from 1 to 6 months. Waiting that long would leave the site running without its server for months, with prices inflated by the same shortage.

What it looked like before

Without dedicated local stock, replacing an out-of-warranty server meant waiting 1 to 6 months for procurement and paying inflated market prices, with prolonged operational exposure.

How Plantformance solved it

Plantformance keeps critical FactoryBrain replacement nodes pre-stocked on the shelf for exactly this case. The team ran the whole response end to end: opening the ticket, investigating the root cause, issuing the quote, processing the order, provisioning and testing the node, shipping it and installing it on site. Because the hardware was already in stock, nothing waited on the market. The time from incident to shipment was 18h.

What changed

The client received a fully provisioned, tested replacement node installed on site, without waiting months for market supply.

Results

  • Full replacement lifecycle completed in 3 days, from failure ticket to on-site installation
  • Incident to shipment in 18h
  • Avoided the 1 to 6 month standard market lead time

Plantformance products and services used

FactoryBrain

Frequently asked questions

How fast can Plantformance replace a failed industrial server?

For Saint-Gobain Life Sciences, Plantformance completed the full replacement lifecycle in 3 days, from failure ticket to on-site installation. The time from incident to shipment was 18h, because a FactoryBrain replacement node was already pre-stocked.

How does Plantformance avoid long hardware lead times during shortages?

Plantformance keeps critical FactoryBrain replacement nodes pre-stocked on the shelf. During a global NVMe/SSD and server hardware shortage, that let Plantformance skip the standard 1 to 6 month OEM lead time and inflated market prices.

Related Ignition case studies

Planning a similar project? Talk to a Plantformance Ignition engineer or browse all 37 Ignition case studies.

Planning a similar Ignition project?

Tell us about your plants and your Ignition setup. A Plantformance engineer will show you how a project like this would work for you.