Ignition live in a large factory 5 days after the order
from order to Ignition live on site
A European glass producer wanted Ignition in a large factory running traditional SCADA. Plantformance shipped 2 stock FactoryBrain 2.0 servers within 24 hours of the order, installed them within 48 hours with IT security requirements met, and had Ignition live for developers 5 days after the order, a 97% shorter project duration.
Key results
- 5 days from order to Ignition live on site
- -97% versus usual project duration
- 24 h to ship the servers
The problem
A business asked to deploy Ignition in a large factory that was running traditional SCADA. In the industry, a project like this usually takes about 6 months. The business wanted Ignition available to its developers fast, with physical servers on site and every IT security requirement met. With excellent teamwork, the goal was to go from order to a live Gateway web page on site in days, not months.
What it looked like before
The factory ran traditional SCADA and wanted to roll out Ignition.
How Plantformance solved it
Plantformance uses standard FactoryBrain 2.0 servers that are kept on the shelf and configured with client specifics only at the last minute. We shipped 2 of them within 24 hours of receiving the order. The servers were received and installed within 48 hours, while the IT security requirements were met in parallel. Ignition was live and ready for developers the same week. From the order to the Gateway web page visible on site took 5 days.
What changed
Ignition is live in the factory, on physical FactoryBrain servers installed locally.
Results
- Ignition in production 5 days after the order, against about 6 months for a typical industry project
- A 97% shorter project duration
- 2 servers shipped within 24 hours of the order
- Servers received and installed within 48 hours with IT security requirements met
Plantformance products and services used
Frequently asked questions
How long does an Ignition deployment usually take?
In the industry, a project like this usually takes about 6 months. Plantformance had Ignition live on site 5 days after the order, a 97% shorter project duration, by using standard FactoryBrain 2.0 servers kept on the shelf and configured with client specifics only at the last minute.
How were IT security requirements met on such a short timeline?
Plantformance met the IT security requirements in parallel while the servers shipped and were installed. The 2 servers were received and installed within 48 hours, and Ignition was live and ready for developers the same week, on physical FactoryBrain servers installed locally.
Related Ignition case studies
- Isolated development servers with no change in operating costs
- 18 factories keep running locally while a cloud ERP syncs in the background
- Managing 200+ Ignition servers in one click, 99% faster
Planning a similar project? Talk to a Plantformance Ignition engineer or browse all 37 Ignition case studies.
Planning a similar Ignition project?
Tell us about your plants and your Ignition setup. A Plantformance engineer will show you how a project like this would work for you.